Skip to main content

Garcia, C., Rabadi, G., Abujaber, D. and Seck, M. (2023). Supporting Humanitarian Crisis Decision Making with Reliable Intelligence Derived from Social Media Using AI, Journal of Homeland Security and Emergency Management

Soykan, B.*, and Rabadi, G. (2022). “A Simulation-Based Optimization Approach for Multi-Objective Runway Operations Scheduling”, Simulation: Transactions of the Society for Modeling and Simulation International

Sumaya bint El Hassan, Cordova, K.E., Rabadi, G. and Wejdan, A.E. (2021) “The (Un)Sustainability of Higher Education Institutions in Jordan”, Frontiers in Sustainability. doi: 10.3389/frsus.2021.653992

Khasawneh, M.*, Shearer, N., Rabadi, G., Bowling, S., and Jaradat, R. (2021). “Evaluating the Impact of Shared Situational Awareness on Combat Effectiveness in Symmetric Engagements”, International Journal of Simulation and Process Modellinghttps://doi.org/10.1504/IJSPM.2021.117317

Tahami, H., Rabadi, G., Haouari, M. (2020) “Exact Approaches for Routing Capacitated Electric Vehicles”, Transportation Research Part E: Logistics and Transportation Review https://doi.org/10.1016/j.tre.2020.102126

Huang, J.*, Gheorghe, A., Handley, H., Pazos, P., Pinto, C.A., Kovacic, S., Collins, A., Keating, C., Sousa-Poza, A., Rabadi, G., Unal, R., Cotter, T., Landaeta, R., and Daniels, C. (2020) “Towards Digital Engineering — The Advent of Digital Systems Engineering”, Int. Journal of Systems of Systems Engineering, Vol. 10, No. 3

Rabadi, G.*, Msakni, M.K., Rodriguez-Velasquez, E., Alvarez-Bermudez, W. (2019). “New Characteristics of Optimal Solutions for the Two-Machine Flowshop Problem with Unlimited Buffers, Journal of Operational Research Society (JORS) 70:6, 962-973, DOI: 10.1080/01605682.2018.1475114

Huang, J.*Khallouli, W.,  Rabadi, G. and Seck, M. (forthcoming). “Intelligent Agent for Hurricane Emergency Identification and Text Information Extraction from Streaming Social Media Big Data”, International Journal of Critical Infrastructures. (Available at https://arxiv.org/pdf/2106.07114.pdf)

Garcia, C.*, Rabadi, G., and Handy, F. (2018). “Dynamic Resource Allocation and Coordination for High-Load Crisis Volunteer Management“, Journal of Humanitarian Logistics and Supply Chain Management, V. 8, No. 4, 533-556

Msakni, M.K., Diabat, A., Rabadi, G., Al-Salem, M., and Kotachi, M. (2018) “Exact methods for the quay crane scheduling problem when tasks are modeled at the single container level”, Computers & Operations Research, V. 99, 218 – 233

Arin, A., and Rabadi, G.* (2017) ” Integrating Estimation of Distribution Algorithms versus Q-Learning into Meta-RaPS for Solving the 0-1 Multidimensional Knapsack Problem“, Computers & Industrial Engineering, V. 112, 706–720, DOI 10.1016/j.cie.2016.10.022

Khasawneh, M.*+Rabadi, G., Bowling, S.R., and Shearer, N. (2017) “Using Integer Partitioning to Determine Unique Configurations for the Information Age Combat Model”, International Journal of Industrial and Systems Engineering, V. 26, No. 3, pp. 364 – 37

Khasawneh, M.*, Shearer, N., Rabadi, G., Bowling, S.R. (2017) “The Information Age Combat Model: A Vision for A Discrete Event Simulation Approach”, V. 12, No. 5, 429 – 445, International Journal of Simulation and Process Modelling

Arin, A., and Rabadi, G.* (2016) “Local Search versus Path Relinking in Metaheuristics: Redesigning Meta-RaPS with Application to the Multidimensional Knapsack Problem”, Applied Soft Computing, V. 46, 317 – 327

Al-Salem, A.*, Bedoya-Valencia, L. and Rabadi, G. (2016) “Exact and Heuristic Algorithms for the Two- Machine Just-In-Time Job Shop Scheduling Problem”, Mathematical Problems in Engineering, Volume 2016 (2016), Article ID 6591632, 11 pages (Open Access)

Rabadi G.*, Stanekzai, A.,S.+, Cotter, T.S. and Al-Salem, M. (2016) “Gravity Model Extensions for the Impact of Mega Sports Events on Tourist Flow”, Journal of Economics, Business and Management, No. 10, Vol. 4, 553 – 560, doi: 10.18178/joebm.2016.4.10.451, http://www.joebm.com/vol4/451-GH0017.pdf

Rabadi G., Khallouli, W., Al-Salem, M., and Ghoniem, A.*, (2015) “Planning and Management of Major Sporting Events: A Survey”, International Journal of Planning and Scheduling, V.2, No 2, P. 154-178

Kaplan, S.*+ and Rabadi, G. (2015) “Minimizing the Total Weighted Tardiness and Instability for the Parallel Machine Re-scheduling Problem with Deadlines and Ready Times”, International Journal of Planning and Scheduling, V.2, No 2, P. 87-109

Arnaout, J-P+, Musa, R., and Rabadi, G.* (2014) “A two-stage Ant Colony Optimization Algorithm to minimize the makespan on Unrelated Parallel Machines – Part II: Enhancements and Experimentations”, Journal of Intelligent Manufacturing, V.25, No. 1, P. 43-45, DOI: 10.1007/s10845-012-0672-3

Köksalmış, E.+, Garcia, C. +, and Rabadi, G.* (2014) “The Optimal Exam Experience: A Timetabling Approach to Prevent Student Cheating and Fatigue”, International Journal of Operational Research, V. 21, No. 3, 263-278

Garcia, C.+, and Rabadi, G.* (2013) “Exact and approximate methods for parallel multiple-area spatial scheduling with release times”, OR Spectrum, V. 35, No. 3, P. 639-657,

Hancerliogullari, G.*+Rabadi, G., Al-Salem, A., Kharbeche, M. (2013) “Greedy Heuristics and Metaheuristics for Multiple Runway Combined Arrival-Departure Aircraft Sequencing Problem”, Journal of Air Transport Management, V. 32, 39 – 48 (listed as most cited since 2011)

Kaplan, S.*+ and Rabadi, G. (2013) “A Simulated Annealing and Meta-RaPS Algorithms for the Aerial Refueling Scheduling Problem with Due Date-to-Deadline Windows and Release Time”, Engineering Optimization, V. 45, No. 1, P.67-87

Bowling, S.R., Rabadi, G.*, Khasawneh, M.+, and Shearer, N.+ (2013) “Sensitivity Analysis Framework for Large-Scale System-of-Systems Applications”, International Journal of System of Systems Engineering, V. 4, No. 1, P. 1 –22

Deller, S.*+Rabadi, G., Tolk, A., and Bowling S. (2012) “Organizing for Improved Effectiveness in Networked Operations”, Military Operations Research Journal (MORS)V. 17, No.1, p. 5-16

Kaplan, S*+. , and Rabadi, G. (2012), “Exact and Heuristic Algorithms for the Aerial Refueling Parallel Machine Scheduling Problem with Due Date-to-Deadline Window and Ready Times”, Computers & Industrial Engineering, V. 62, No. 1, P. 276 – 285

Bowling, R.S.*, Rabadi, G., Khasawneh, M.+, Shearer, N.+ and Zhang, J.+ (2012) “Initiative Mapping Methodology for Systems-of-Systems Applications”, International Journal of Industrial and Systems Engineering, V. 10, No.1, P. 75 – 95

Garcia, C.*+ and Rabadi, G. (2011) “A Meta-RaPS Algorithm for Spatial Scheduling with Release Times”, International Journal of Planning and Scheduling, V. 1, No.1/2, P. 19 – 31

Garcia, C.*+ and Rabadi, G.* (2011) “Optimizing Coordinated Multi-Team Volunteer Scheduling: A Combined Constraint Programming and Goal Programming Approach”. International Journal of Industrial and Systems Engineering V. 9, No 2, P. 183 – 193

Arin, A.+Rabadi, G.*, and Unal, R. (2011), “Comparative Studies on Design of Experiments for Tuning Parameters in a Genetic Algorithm for a Scheduling Problem”, International Journal of Experimental Design and Process Optimisation, V. 2, No. 2, P. 102 – 124

Arnaout, J-P.+, Rabadi, G.* and Musa, R. (2010) “A Two-stage Ant Colony Optimization to Minimize the Makespan on Unrelated Parallel Machines with Sequence-Dependent Setup Times”, Journal of Intelligent Manufacturing, Vol. 21, No. 6, P. 693 – 701

Keating, C.*, Rabadi, G., Landaeta, R. and Bowling, S. R. (2009) “System of Systems Engineering for Border Security and Immigration: Methodologies, Processes, & Tools”, International Journal of System of Systems Engineering, Vol. 1, No. 4, P. 414 – 444

Deller, S.T.*+, Bell, M.I., Bowling, S.R., Rabadi, G., and Tolk, A. (2009) “Applying the Information Age Combat Model: Quantitative Analysis of Network Centric Operations”, The International Command and Control (C2) Journal. Vol. 3, No. 1

Tolk, A.*, Rabadi, G., Merino, D. (2009) “Embedding Simulation Education into the Engineering Management Body of Knowledge”, International Journal of Simulation and Process Modelling, Vol. 5, No. 1, p. 14 – 19

Kaylani, A., Mollaghasemi, M., Cope, D., Fayez, S., Rabadi, G., Steele, M. (2008). “A generic environment for modelling future launch operations—GEM-FLO: a success story in generic modelling”, Journal of the Operational Research Society, Vol. 59, No.10, P. 1312-1320 (October, 2008)

Arnaout, J-P.+ and Rabadi, G.* (2008) “Rescheduling of Unrelated Parallel Machines Under Machine Breakdowns”, International Journal of Applied Management Science, Vol. 1, No. 1, P. 75 – 89.

Landaeta, R.*, Mun, J., Rabadi, G., and Levin, D. (2008), “Identifying Sources of Resistance to Change in Healthcare”, Vol. 9, No. 1, P. 74 – 95, International Journal of Healthcare Technology and Management (IJHTM)

Arnaout, J-P.+ and Rabadi, G.* (2007), “Predictable Scheduling With Learning Capability for The Unrelated Parallel Machine Problem”, International Journal of Operations & Quantitative Management. Vol. 13, No. 2, P. 115 – 127

Rabadi, G.*, Anagnostopoulos, G., and Mollaghasemi, M. (2007),   “A Heuristic Algorithm for The Just-In-Time Single Machine Scheduling Problem With Setups: A Comparison With A Simulated Annealing”, The International Journal of Advanced Manufacturing Technology, Vol. 32, No. 3-4, P. 326 – 335.

Abuhilal, L.+RabadiG.*, and Sousa-Poza, A. (2006), “Supply Chain Inventory Control: A Comparison Among JIT, MRP, and MRP with Information Sharing Using Simulation”, Engineering Management Journal, Special Issue on Supply Chain management, Vol. 18, No. 2, p. 51 – 57

Helal, M.+Rabadi, G.*, Al-Salem, A., (2006) “A Tabu Search Algorithm to Minimize the Makespan for Unrelated Parallel Machines Scheduling Problem with Setup Times”, International Journal of Operations Research, Vol. 3, No. 3, P. 182 – 192.

Rabadi, G.*, Moraga, R., and Al-Salem, A. (2006), “Heuristics for the Unrelated Parallel Machine Scheduling Problem with Setup Times”, Journal of Intelligent Manufacturing, Vol. 17, p. 85 – 97.

Arnaout, J-P.+Rabadi, G.*, and Mun, J. (2006) “A Dynamic Heuristic for the Stochastic Unrelated Parallel Machine Scheduling Problem“, Special Issue special issue on Scheduling in Manufacturing, Information, and Service Industries, International Journal of Operations Research, Vol. 3, No.2, P. 136 – 143.

Duwayri, Z.+, Mollaghasemi, M., Nazzal, D.+, and RabadiG.* (2006), “Scheduling Setups Changes at Bottleneck Facilities in Semiconductor Manufacturing”, Special issue on semiconductor manufacturing in Production Planning and Control Journal,. Vol. 17, No. 7, P. 717 – 727

Rabadi, G.*, Mollaghasemi, M., and Anagnostopoulos, G.C., (2004) “A Branch-and-Bound Algorithm for the Early/Tardy Machine Scheduling Problem with a Common Due-Date and Sequence-Dependent Setup Time”, Computers & Operations Research Journal, Vol. 31, No. 10, p. 1727-1751

Keating, C.*, Rogers, R., Unal, R., Dryer, D., Sousa-Poza, A., Safford, R., Peterson, W., Rabadi, G. (2003), “System of Systems EngineeringEngineering Management Journal, Vol. 15, No. 3, p.36-45.


*indicates a student